The Africa Mercy entering the dry dock in the port of Durban, South Africa. |
Below decks, the deck plates have been removed around the Frichs and Harbour generators to prepare them to be removed from the ship. |
The Frichs generators, still in position, and beyond the hole cut in the port side of the hull for the removal of the generators. |
The two Harbour generators having been transported into the ballast tank besides the harbour generator room, waiting to be removed from the ship. |
The hole cut in the port side of the hull of the Africa Mercy to remove the old generators. You can see the Frichs generators inside waiting to be removed. |
One of the four new MAN generators waiting to be installed. |
The empty Frichs generator room, facing to the starboard side. That green square on the floor is the incinerator, waiting to be returned to its correct place. |