Friday, October 29, 2010

Reaching The Midway Point

Ken Berry, Project Manager reports from Durban that the Generator Replacement Project has reached its midway point with the new generator sets and associated equipment safely installed onboard and the hole in the side of the ship welded up. The Technical crews are busy reinstalling the existing piping and equipment that had to be temporarily removed to allow the shifting of the new generator sets from the hole in the hull to their proper resting places in the Forward and Aft Generator rooms. New piping systems, racks for the new power cables and new exhaust lines are starting to be installed. The existing Main Switchboard is being upgraded to accept the new generators and includes an up-to-date Power Management System, that will simplify operating the system and provide a more secure power source to critical areas of the ship, especially the hospital.
Another project that has reached its midway point is the installation of the new Main Engine Control System. Literally four miles (6 KM) of signal cabling is currently being installed to connect all the Main Engines to the new control gear located on the Bridge and in the Control Room. The ‘cable pulling’ team is made up primarily of Dutch Electricians and Technicians, who assembled onboard the Africa Mercy to tackle the installation of this extensive system that requires a large range of technical disciplines to successfully install. Other project work is ongoing in the Hospital, galley, pool and other areas around the ship, to make the ship more accommodating for the crew and more effective as a tool of service to our patients while in Field Service.

Thursday, October 28, 2010

Connecting the Generators

All the new generators are now in place onboard the Africa Mercy and in the process of being connected to the various systems and controls.


Covered in a tarpaulin for protection, one of the new
generators sits in place waiting to be connected.
Photo courtesy of Chuck Dodgen

Thursday, October 21, 2010

Closing The Hole In The Hull

With all the generator sets safely onboard, a welding team
welded the entry hole in the hull of the Africa Mercy shut.

Friday, October 15, 2010

All The Generators Are Now Onboard

The new MAN generators are now inside the Africa Mercy, although not positioned or welded down yet.

The new generators being craned onto the loading platform



Ready to be moved into the Africa Mercy
 
One of the new MAN generators, starboard side in
old Frichs generator room, waiting to be installed 

(photos courtesy of Africa Mercy crew members Chuck Dodgen and Olly Peet.)

Thursday, October 14, 2010

Preparing The MAN Generators For Installation

Justin Ray, Project Engineer and Ken Berry, Project Manager, uncover
one of the new MAN Generators to prepare it for installation.

Ken Berry, Project Manager

Tuesday, October 12, 2010

Strengthening The Deck

In preparation for the installation of the new generators, work is being done to reinforce the tank tops, ready for the arrival of the 10 ton bases.




 One of the bases shortly before it was lifted into the ship.


(photos courtesy of Africa Mercy crew member Olly Peet.)

Monday, October 11, 2010

The First Of The MAN Generators Is Onboard!

The first of four new 5L21/31 type MAN generators are brough onboard the Africa Mercy!